To ask Her Majesty’s Government, further to the answer by Lord De Mauley on 25 February (HL Deb, cols 1648–9) concerning solar panels, whether they plan to extend the policy of not subsidising farmers twice for solar panels to wind farms.
To ask Her Majesty’s Government, further to the answer by Lord De Mauley on 25 February (HL Deb, cols 1648–9) concerning solar panels, whether they plan to extend the policy of not subsidising farmers twice for solar panels to wind farms.
Wind turbines and their hard standings are already ineligible under the basic payments scheme. Wind farms do not significantly hamper agricultural activity as they require widely spaced turbines and the blades are sited well above field level. Accordingly, the Government has no plans to make wind farms ineligible for payment.
To ask Her Majesty’s Government what are the average costs of connecting (1) onshore wind turbines, (2) offshore wind turbines, and (3) fossil-fuelled and nuclear power stations, to the national grid. [HL3196]
To ask Her Majesty’s Government what are the average costs of connecting (1) onshore wind turbines, (2) offshore wind turbines, and (3) fossil-fuelled and nuclear power stations, to the national grid. [HL3196]
It is not possible to give meaningful average costs of connecting different sorts of generation to the national electricity transmission system. Generators pay towards the costs of building and maintaining the network through on-going use of system charges. These charges are calculated on an annual basis and reflect the cost that each generator imposes on the network. They vary according to a range of factors which are not specific to a particular generation technology, including the capacity and location of the generator in question.
To ask Her Majesty’s Government what proportion of total installed generating capacity is required to preserve security of supply, including during periods of maximum demand; and what proportion is made up by wind power.
To ask Her Majesty’s Government what proportion of total installed generating capacity is required to preserve security of supply, including during periods of maximum demand; and what proportion is made up by wind power.
To ask Her Majesty’s Government what impact the output and availability performance of onshore and offshore wind farms during November and December 2010 has had on their policy for non-carbon-producing energy generation.
To ask Her Majesty’s Government what impact the output and availability performance of onshore and offshore wind farms during November and December 2010 has had on their policy for non-carbon-producing energy generation.
To ask Her Majesty’s Government what was the maximum electricity demand met (in megawatts) in November; and what proportion of that was met from onshore wind farms.
To ask Her Majesty’s Government what was the maximum electricity demand met (in megawatts) in November; and what proportion of that was met from onshore wind farms.
To ask Her Majesty's Government what proposals they have (a) to ensure that sufficient electricity will be generated when wind turbines are not operating, and (b) to absorb excess power from wind turbines during periods of low electricity demand.
To ask Her Majesty's Government what proposals they have (a) to ensure that sufficient electricity will be generated when wind turbines are not operating, and (b) to absorb excess power from wind turbines during periods of low electricity demand.
To ask Her Majesty's Government what assumptions they are making about the working life of (a) land-based wind turbines, and (b) sea-level wind turbines, in their cost estimates of providing electricity from wind power.
To ask Her Majesty's Government what assumptions they are making about the working life of (a) land-based wind turbines, and (b) sea-level wind turbines, in their cost estimates of providing electricity from wind power.
To ask Her Majesty's Government what proportion of electricity was produced by wind turbines during the recent cold weather.
To ask Her Majesty's Government what proportion of electricity was produced by wind turbines during the recent cold weather.
To ask Her Majesty's Government what was the availability of wind-produced electrical power at periods of peak demand during the recent cold weather.
To ask Her Majesty's Government what was the availability of wind-produced electrical power at periods of peak demand during the recent cold weather.
| Table 1: Electricity supplied by wind during peak demand | ||
|---|---|---|
| Date | MWh produced between 5 and 6 pm | Percentage of electricity supplied relative to theoretical maximum supply |
| 1 January | 375 | 24 |
| 2 | 479 | 31 |
| 3 | 152 | 10 |
| 4 | 326 | 21 |
| 5 | 657 | 42 |
| 6 | 246 | 16 |
| 7 | 72 | 5 |
| 8 | 150 | 10 |
| 9 | 134 | 9 |
| 10 | 957 | 61 |
| 11 | 790 | 50 |
| 12 | 1128 | 72 |
| 13 | 491 | 31 |
| 14 | 292 | 19 |
| 15 January | 999 | 64 |
To ask Her Majesty's Government what is the cost per unit of electricity provided by (a) wind turbines; (b) coal-fired power stations without carbon capture; (c) coal-fired power stations with carbon capture; (d) gas-fired power stations; and (e) nuclear power stations, including decommissioning costs.
To ask Her Majesty's Government what is the cost per unit of electricity provided by (a) wind turbines; (b) coal-fired power stations without carbon capture; (c) coal-fired power stations with carbon capture; (d) gas-fired power stations; and (e) nuclear power stations, including decommissioning costs.
| Technology | Levelised cost (£/MWh) 2010 | Levelised cost (£/MWh) 2020 |
| Wind Plant | ||
| Onshore Wind (High wind) | 65 | 62 |
| Offshore Wind (High wind) | 83 | 82 |
| Coal-fired plant | ||
| Coal—central fuel | 54 | 74 |
| Coal CCS—central fuel | 60 | |
| Gas-fired plant | ||
| CCGT—central fuel | 53 | 61 |
| Nuclear plant | ||
| Nuclear | 51 | 47 |
To ask Her Majesty's Government further to the Written Statement by Lord Hunt of Kings Heath on 24 June (WS 115–6), whether the statement by Lord Hunt of Kings Heath that the installation of 25 gigawatts (25,000 megawatts) of wind turbine capacity by 2020 would meet more than a quarter...
To ask Her Majesty's Government further to the Written Statement by Lord Hunt of Kings Heath on 24 June (WS 115–6), whether the statement by Lord Hunt of Kings Heath that the installation of 25 gigawatts (25,000 megawatts) of wind turbine capacity by 2020 would meet more than a quarter...
To ask Her Majesty's Government what is the projected cost of creating the infrastructure to provide 25 gigawatts (25,000 megawatts) of offshore wind power; and what is the cost of connecting the turbines to the National Grid.
To ask Her Majesty's Government what is the projected cost of creating the infrastructure to provide 25 gigawatts (25,000 megawatts) of offshore wind power; and what is the cost of connecting the turbines to the National Grid.