1-14 of 14 results for tabledby:"Edward Morello"
Librarians' tools
- Search time
- 0.18 seconds
- Solr query time
- 0.002 seconds
- Search query
- tabledby:"Edward Morello"
- We searched for
- tablingMember_ses:547148
Type
House
Session
Year
Department
Member
Primary member
Answering member
More
Legislative stage
Legislation
Subject
Publisher
To ask the Secretary of State for Transport, what assessment his Department has made of the adequacy of rail connectivity for rural constituencies such as West Dorset.
To ask the Secretary of State for Transport, what assessment his Department has made of the adequacy of rail connectivity for rural constituencies such as West Dorset.
The Department for Transport does not routinely assess the adequacy of rail connectivity on a constituency-by-constituency basis. However, the Department considers connectivity impacts as part of its wider appraisal of rail services and infrastructure investment.
To ask the Secretary of State for Transport, what discussions his Department has had with rail operators on service reliability caused by climate change affecting West Dorset.
To ask the Secretary of State for Transport, what discussions his Department has had with rail operators on service reliability caused by climate change affecting West Dorset.
The Department engages regularly with Network Rail and the Train Operating Companies (TOCs) on the impact of extreme weather and climate change on rail service reliability across the network, including on routes serving rural areas such as West Dorset.
Network Rail has developed Weather Resilience and Climate Change Adaptation (WRCCA) plans to identify climate-related risks and improve the resilience and reliability of the rail infrastructure affected by flooding, storms, heatwaves, and other extreme weather events. In early 2026, the TOCs, including those serving West Dorset, also completed their first WRCCA plans, focusing on weather and climate risks to stations, services, staff, and customers.
In advance of the establishment of Great British Railways, Network Rail and the TOCs, supported by the Department, are working together increasingly closely to take a holistic view of climate risks to the rail network and to develop adaptation plans.
To ask the Secretary of State for Transport, what discussions his Department has had with rail operators on service reliability affecting West Dorset.
To ask the Secretary of State for Transport, what discussions his Department has had with rail operators on service reliability affecting West Dorset.
The Department works closely with train operators and Network Rail to improve reliability and performance on services across the network, including those serving West Dorset.
Improvement activity includes targeted work to address infrastructure reliability, timetable resilience, and staffing availability. Operators are also working with Network Rail to reduce disruption from infrastructure failures and external factors such as trespass and weather-related incidents.
To ask the Secretary of State for Transport, what steps her Department is taking to improve train services to West Dorset.
To ask the Secretary of State for Transport, what steps her Department is taking to improve train services to West Dorset.
The Department works closely with train operators and Network Rail to improve reliability and performance on services across the network, including those serving West Dorset.
Improvement activity includes targeted work to address infrastructure reliability, timetable resilience, and staffing availability. Operators are also working with Network Rail to reduce disruption from infrastructure failures and external factors such as trespass and weather-related incidents.
To ask the Secretary of State for Transport, what steps his Department is taking to help develop (a) engineering and (b) maintenance adaptations to protect (i) roads, (ii) railways and (iii) embankments from an increase in the number of high soil moisture deficit events.
To ask the Secretary of State for Transport, what steps his Department is taking to help develop (a) engineering and (b) maintenance adaptations to protect (i) roads, (ii) railways and (iii) embankments from an increase in the number of high soil moisture deficit events.
The maintenance of earthworks is the responsibility of the asset owner, specifically Network Rail for the mainline railway network, National Highways for the strategic road network and Local Authorities for local roads. The technical expertise needed to analyse how specific types of earthworks will be affected by the changing climate sits within those organisations and interventions to adapt the engineering and maintenance of these assets are being initiated and driven by them. The Department for Transport closely monitors the performance of the rail and road networks to assure itself that Network Rail and National Highways are taking effective measures to ensure climate resilience. The Office of Rail and Road are also responsible for ensuring that Network Rail is satisfactorily managing all risks that affect the safety of the railway.
To ask the Secretary of State for Transport, what assessment her Department has made of the potential impact of the US trade deal on levels of bioethanol production in the UK.
To ask the Secretary of State for Transport, what assessment her Department has made of the potential impact of the US trade deal on levels of bioethanol production in the UK.
The closure of UK bioethanol production in the UK this year represents a significant loss in capacity. However, it is not considered likely to impact the manufacture or supply of E10 petrol in the UK. It is expected that the supply of bioethanol for petrol suppliers will continue to be met by both bioethanol produced at the remaining UK plants and by imports. The US-UK Economic Prosperity Deal (EPD) does not impact the number of litres of ethanol that will be supplied in the UK as renewable transport fuel.
Any proposals to change legislation covering the bioethanol content of petrol, to move from E10 to E20 for example, would be subject to extensive public consultation, and include a full assessment of impacts. There is no timeline for the introduction of E20 petrol in the UK, as no decision has been made to mandate E20 or to make any other changes to ethanol blending permitted in petrol standards. The Department will be setting up an expert working group later this year to investigate the feasibility of increasing the level of ethanol blending in petrol in the UK beyond E10.
To ask the Secretary of State for Transport, what assessment her Department has made of the potential impact of moving from E10 to E20 petrol on vehicles and consumers.
To ask the Secretary of State for Transport, what assessment her Department has made of the potential impact of moving from E10 to E20 petrol on vehicles and consumers.
The closure of UK bioethanol production in the UK this year represents a significant loss in capacity. However, it is not considered likely to impact the manufacture or supply of E10 petrol in the UK. It is expected that the supply of bioethanol for petrol suppliers will continue to be met by both bioethanol produced at the remaining UK plants and by imports. The US-UK Economic Prosperity Deal (EPD) does not impact the number of litres of ethanol that will be supplied in the UK as renewable transport fuel.
Any proposals to change legislation covering the bioethanol content of petrol, to move from E10 to E20 for example, would be subject to extensive public consultation, and include a full assessment of impacts. There is no timeline for the introduction of E20 petrol in the UK, as no decision has been made to mandate E20 or to make any other changes to ethanol blending permitted in petrol standards. The Department will be setting up an expert working group later this year to investigate the feasibility of increasing the level of ethanol blending in petrol in the UK beyond E10.
To ask the Secretary of State for Transport, what her planned timeline is for the introduction of E20 petrol in the UK.
To ask the Secretary of State for Transport, what her planned timeline is for the introduction of E20 petrol in the UK.
The closure of UK bioethanol production in the UK this year represents a significant loss in capacity. However, it is not considered likely to impact the manufacture or supply of E10 petrol in the UK. It is expected that the supply of bioethanol for petrol suppliers will continue to be met by both bioethanol produced at the remaining UK plants and by imports. The US-UK Economic Prosperity Deal (EPD) does not impact the number of litres of ethanol that will be supplied in the UK as renewable transport fuel.
Any proposals to change legislation covering the bioethanol content of petrol, to move from E10 to E20 for example, would be subject to extensive public consultation, and include a full assessment of impacts. There is no timeline for the introduction of E20 petrol in the UK, as no decision has been made to mandate E20 or to make any other changes to ethanol blending permitted in petrol standards. The Department will be setting up an expert working group later this year to investigate the feasibility of increasing the level of ethanol blending in petrol in the UK beyond E10.
To ask the Secretary of State for Transport, when her Department plans to announce the outcome of the feasibility study into step-free access at Dorchester South station.
To ask the Secretary of State for Transport, when her Department plans to announce the outcome of the feasibility study into step-free access at Dorchester South station.
We are committed to improving the accessibility of the railway and recognise the social and economic benefits this brings to communities.
Since 2006 the Access for All programme has installed accessible, step free routes at over 270 stations plus a range of smaller scale access improvements at around 1500 stations.
In May 2024, the previous government agreed the publication of a list of 50 additional stations selected for initial feasibility work, which included Dorchester South railway station.
Network Rail have now completed all 50 feasibility studies and we will shortly be announcing which of those stations will progress.
I am pleased that Dorset Council have already pledged some funding for the project but would welcome any further contributions that could be found.
To ask the Secretary of State for Transport, whether Dorchester South station will be prioritised for funding under the Access for All programme following the feasibility study.
To ask the Secretary of State for Transport, whether Dorchester South station will be prioritised for funding under the Access for All programme following the feasibility study.
We are committed to improving the accessibility of the railway and recognise the social and economic benefits this brings to communities.
Since 2006 the Access for All programme has installed accessible, step free routes at over 270 stations plus a range of smaller scale access improvements at around 1500 stations.
In May 2024, the previous government agreed the publication of a list of 50 additional stations selected for initial feasibility work, which included Dorchester South railway station.
Network Rail have now completed all 50 feasibility studies and we will shortly be announcing which of those stations will progress.
I am pleased that Dorset Council have already pledged some funding for the project but would welcome any further contributions that could be found.
To ask the Secretary of State for Transport, if she will make an assessment of the potential merits of step-free access for (a) disabled passengers, (b) older residents and (c) families with children at Dorchester South Station.
To ask the Secretary of State for Transport, if she will make an assessment of the potential merits of step-free access for (a) disabled passengers, (b) older residents and (c) families with children at Dorchester South Station.
We are committed to improving the accessibility of the railway and recognise the social and economic benefits this brings to communities.
Since 2006 the Access for All programme has installed accessible, step free routes at over 270 stations plus a range of smaller scale access improvements at around 1500 stations.
In May 2024, the previous government agreed the publication of a list of 50 additional stations selected for initial feasibility work, which included Dorchester South railway station.
Network Rail have now completed all 50 feasibility studies and we will shortly be announcing which of those stations will progress.
I am pleased that Dorset Council have already pledged some funding for the project but would welcome any further contributions that could be found.
To ask the Secretary of State for Transport, what discussions her Department has had with (a) Dorset Council and (b) local stakeholders on funding contributions towards accessibility improvements at Dorchester South Station.
To ask the Secretary of State for Transport, what discussions her Department has had with (a) Dorset Council and (b) local stakeholders on funding contributions towards accessibility improvements at Dorchester South Station.
We are committed to improving the accessibility of the railway and recognise the social and economic benefits this brings to communities.
Since 2006 the Access for All programme has installed accessible, step free routes at over 270 stations plus a range of smaller scale access improvements at around 1500 stations.
In May 2024, the previous government agreed the publication of a list of 50 additional stations selected for initial feasibility work, which included Dorchester South railway station.
Network Rail have now completed all 50 feasibility studies and we will shortly be announcing which of those stations will progress.
I am pleased that Dorset Council have already pledged some funding for the project but would welcome any further contributions that could be found.
To ask the Secretary of State for Transport, if she will make it her policy to require train operating companies to guarantee that rail replacement services will be accessible for disabled passengers.
To ask the Secretary of State for Transport, if she will make it her policy to require train operating companies to guarantee that rail replacement services will be accessible for disabled passengers.
Rail replacement services operated by train operating companies must meet the needs of disabled passengers. This includes using vehicles compliant with the Public Service Vehicles Accessibility Regulations 2000 (PSVAR). The train operators can only use non-PSVAR compliant vehicles when no compliant vehicle is available under the current exemption which will expire in July 2026. The Office of Rail and Road (ORR) collects data on the levels of compliance with the PSVAR from the train operators. The ORR’s Annual Consumer Report for 2024/2025 showed that 96 per cent of rail replacement vehicles met required standards.
To ask the Secretary of State for Transport, what steps her Department is taking to ensure that South Western Railway rail replacement bus services are fully wheelchair accessible.
To ask the Secretary of State for Transport, what steps her Department is taking to ensure that South Western Railway rail replacement bus services are fully wheelchair accessible.
Regulatory requirements apply to South Western Railway (SWR) to ensure rail replacement buses meet the necessary standards on accessibility. SWR works with its rail replacement providers to ensure services are accessible as far as possible, but if accessible options are not available, SWR will arrange alternative accessible transport.